June 2020

Success Story with System M240

02_Success Story_image

With the Universal System M240 you save time, space and money!
Based on the partial renovation of the psychiatry clinic St. Gallen Nord in Switzerland you see that these are not only nice words. Thanks to the modern bus wiring the 3 M240 controllers now take up substantially less space. They do not only control the fire dampers but also the ventilation systems.

Key Data of the Project

Before the renovation: 37 fire dampers, 3 fans, conventional wiring of each of the fire dampers in the control cabinet.

After the renovation: Modern SMT bus system with M240 controllers, controls and monitors the 37 fire dampers and 3 fans via UFC24 field controllers.

Application: The 3 pcs. M240 controllers replace the whole control cabinets! The 37 pcs. UFC24 resp. the motorized fire dampers and the 3 fans are controlled and monitored via bus communication. Thanks to the automatic commissioning of the M240 controller and the excellent work of the involved parties, commissioning was completed in a very short time.

Positive feedback from the project participant

« The modernization of the fire damper system is a matter of trust » Client Canton of St. Gallen Building Authority

« The M240 system is so self-explanatory that we can take over the operation ourselves during the acceptance test. It doesn’t need SMT.» Calorex planing office

« With the dismantling of the control cabinets and the removal of the associated cabling, the building was ”decoppered “» Electrical company Alpiq InTec Ost

Learn more about the project and the Universal System M240

Animation Universal System M240